Carbon Monoxide Safety Association
An Affiliate of the
ESCO Group

Online Services
Test Results
About COSA
Calibration
Carbon Monoxide
Combustion Analysis
CO News
Catalog
Contact US
Links
Store
Calendar
Calibration
Training
Training
B-Vent
Carbon Monoxide
Combustion Analysis
Fuel Gas Piping
Green Awareness
R-410A
Training Team
Home

 

B-Vent

Sealing up metal vent pipeDrilling holes in vent connectors, vents and chimney systems has been a part of combustion system control since the onset of contained combustion systems.

Where possible, the measurement of over-fire and stack temperatures as well as draft and combustion gas content is the only way to verify the complete and safe combustion of the operating system.

These measurements also verify the equipment’s performance to be within the understood parameters in which the equipment was sold and serviced.

Please note the documents associated with this link contain specifics as to how each manufacturer instructs on the drilling of test holes into their vent products and the methodology prescribed to seal the holes at the conclusion of testing.

If you don’t test, you don’t know.

Resources

 

 

© COSA All rights reserved